Changes

Jump to navigation Jump to search
m
Line 28: Line 28:  
# Backfill the holes with the excavated soil and flag and label their locations so you can pick them up for the plan.
 
# Backfill the holes with the excavated soil and flag and label their locations so you can pick them up for the plan.
   −
*If a test hole is discarded due to flow in a root channel or similar, record the information and make a replacement test. If there is a large variation (greater than or equal to 50%) between tests in the
+
*If a test hole is discarded due to flow in a root channel or similar, record the information and make a replacement test. If there is a large variation (greater than or equal to 50%) between tests in the same soil layer, increase the number of tests.
same soil layer, increase the number of tests.
      
====Paper basket to protect hole====
 
====Paper basket to protect hole====
8,255

edits

Navigation menu