Changes

Jump to navigation Jump to search
m
Line 47: Line 47:  
# Natural features such as watercourses and wetlands;
 
# Natural features such as watercourses and wetlands;
 
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
 
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
==Survey Documentation Minimum Requirements==
+
===Survey documentation minimum requirements===
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
 
# Document with text descriptor identifying overall approach and methodology;
 
# Document with text descriptor identifying overall approach and methodology;
Line 64: Line 64:  
# Digital copy of the survey data when applicable; and
 
# Digital copy of the survey data when applicable; and
 
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
 
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
 +
 
==Geospatial Data Submission Minimum Requirements==
 
==Geospatial Data Submission Minimum Requirements==
 
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
 
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
8,255

edits

Navigation menu