Changes

Jump to navigation Jump to search
m
Line 49: Line 49:  
===Pretreatment===
 
===Pretreatment===
 
*A [[gravel diaphragm]] at the top of the slope is always recommended.  
 
*A [[gravel diaphragm]] at the top of the slope is always recommended.  
*When filter strip slopes are greater than 5%, a series of level spreaders (e.g. gravel diaphragms) should be used to help maintain sheet flow.  
+
*When filter strip slopes are greater than 5%, a series of [[level spreaders]] or gravel diaphragms should be used to help maintain sheet flow.  
*Filter strips should drain continuously as sheet flow until reaching a [[swales|swale]], [[bioretention]] facility, or other LID practice.  
+
*Filter strips should drain continuously as sheet flow until reaching a [[swales|swale]], [[bioretention]] facility, or other LID practice.
 +
 
 
===Berms===
 
===Berms===
 
*When designed as a stand alone water quality BMP (i.e., not pretreatment to another BMP) the vegetated filter strip should be designed with a pervious berm at the toe of the slope for shallow ponding of runoff.
 
*When designed as a stand alone water quality BMP (i.e., not pretreatment to another BMP) the vegetated filter strip should be designed with a pervious berm at the toe of the slope for shallow ponding of runoff.
8,255

edits

Navigation menu