'''<h3>LID opportunities in parks</h3>'''  [[File:Example.jpg|thumb|upright=0.6|The bioretention area installed at O’Connor Park
+
'''<h3>[[LID opportunities in parks]]</h3>'''  [[File:Example.jpg|thumb|upright=0.6|The bioretention area installed at O’Connor Park
 
in Mississauga is part of a stormwater management system
 
in Mississauga is part of a stormwater management system
 
that treats parking lot runoff prior to discharging to a local
 
that treats parking lot runoff prior to discharging to a local
Line 53: Line 53:  
roadwork, will affect the operation of LID practices in the park.
 
roadwork, will affect the operation of LID practices in the park.
 
<br><br>
 
<br><br>
'''<h3>Inter-municipal transfer of funds</h3>''' Integrating LID practices into the municipal stormwater
+
'''<h4>Inter-municipal transfer of funds</h4>''' Integrating LID practices into the municipal stormwater
 
management framework may change how municipal funds are
 
management framework may change how municipal funds are
 
managed. Traditional stormwater management maintenance
 
managed. Traditional stormwater management maintenance
Line 67: Line 67:  
<br><br>
 
<br><br>
   −
'''<h3>Source Areas</h3>'''  [[File:Example3.jpg|thumb|upright=0.6|The road surface (left) contributes significantly
+
'''<h4>Source Areas</h4>'''  [[File:Example3.jpg|thumb|upright=0.6|The road surface (left) contributes significantly
 
more stormwater pollutants than the parkland area (right). To
 
more stormwater pollutants than the parkland area (right). To
 
achieve maximum watershed benefit a designer could consider
 
achieve maximum watershed benefit a designer could consider
Line 104: Line 104:  
!colspan="3" style="background: brown; color: white"|'''o Unlikely'''
 
!colspan="3" style="background: brown; color: white"|'''o Unlikely'''
 
  |}
 
  |}
'''<h3>Making it happen: Approaches to getting LID into parks </h3>'''
+
'''<h3>[[Making it happen: Approaches to getting LID into parks]] </h3>'''
    
The scale of your LID project will largely determine how you
 
The scale of your LID project will largely determine how you
Line 168: Line 168:  
For example, installing bioretention, infiltration chambers,
 
For example, installing bioretention, infiltration chambers,
 
or permeable pavement in a parking lot requires removal of
 
or permeable pavement in a parking lot requires removal of
existing pavement. Budget and resources set aside for parking
+
existing pavement. Budget and resources set aside for parking lot replacement could be transferred to a retrofit project that
 +
includes replacement of this infrastructure.<br>
 +
'''<h4>Involvement of consultants and contractors</h4>'''
 +
Consultants are required for large-scale retrofit projects,
 +
specifically for the final screening of options, pre-design,
 +
detailed design, tender and contract documents, construction
 +
supervision and administration, and assumption and
 +
verification. Site contractors are also required for large-scale LID retrofits.
 +
Ideally, contractors should be pre-qualified based on previous
 +
experience with similar LID projects.
 +
<br>
 +
'''<h4>More intensive public consultation</h4>'''
 +
Stakeholders must be closely involved in the retrofit process
 +
for large-scale LID projects. These projects have longer
 +
construction windows, may have significant impacts on longterm
 +
public use patterns of the park, and will cost significantly
 +
more taxpayer dollars.
 +
Gaining public insight in advance of LID implementation can
 +
help address public concerns and information gaps, as well as
 +
identify public supporters and champions. Public consultation
 +
can help designers tailor the project to address community
 +
concerns and values. [[File:Example5.jpg|thumb|upright=0.6|When installing new parks equipment, consider whether the LID practices can be integrated into the design. Here a
 +
bioswale has been built into the landscape between a playground and sidewalk. (Source: CVC)]]
 +
 
 +
'''<h4>External approvals</h4>'''
 +
Large-scale park retrofits may require a variety of approvals
 +
at the municipal, watershed, provincial, and/or federal level.
 +
Since LID is still relatively new, you may encounter policies
 +
or bylaws that present barriers to LID retrofit projects.
 +
Alternatively, the municipality may have to enforce some
 +
policies and bylaws to facilitate the implementation of LID
 +
projects within parks.
 +
<br>
 +
'''<h4>Next Steps</h4>'''
 +
After reading this chapter you should know how to select the
 +
right LID practice for your site. You should also be familiar
 +
with the details you need to consider before undertaking an
 +
LID retrofit.