==Planning considerations==
 
==Planning considerations==
 
<h3>Space</h3>  
 
<h3>Space</h3>  
{Plainlist|1=
+
{{Plainlist|1=
 
*For optimal performance bioretention facilities should receive runoff from between 5 to 20 times their own surface area.  
 
*For optimal performance bioretention facilities should receive runoff from between 5 to 20 times their own surface area.  
 
*In the conceptual design stage it is recommended to set aside approximately 10 - 20 % of a catchment area to the bioretention facility.  
 
*In the conceptual design stage it is recommended to set aside approximately 10 - 20 % of a catchment area to the bioretention facility.  
Line 27: Line 27:  
*Bioretention can be almost any shape, from very curving, soft edges with variable depth, to angular,  hard sided and uniform depth.
 
*Bioretention can be almost any shape, from very curving, soft edges with variable depth, to angular,  hard sided and uniform depth.
 
:For ease of construction and to ensure that the vegetation has adequate space, cells should be no narrower than 0.6 m at any point.  
 
:For ease of construction and to ensure that the vegetation has adequate space, cells should be no narrower than 0.6 m at any point.  
:The maximum width of a facility is determined by the reach of the construction machinery, which must not be tracked into the cell.}
+
:The maximum width of a facility is determined by the reach of the construction machinery, which must not be tracked into the cell.}}
 
{{:Bioretention: Context}}
 
{{:Bioretention: Context}}
 
<h3>Infiltration</h3>
 
<h3>Infiltration</h3>