Changes

Jump to navigation Jump to search
Line 80: Line 80:     
=== Life Cycle Costing Requirements ===
 
=== Life Cycle Costing Requirements ===
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/low-impact-development-life-cycle-costs/ LID Life Cycle Costing Tool]
+
 
 +
The capital and life cycle costs of seven Low Impact Development (LID) practices and seventeen design scenarios were evaluated based on a detailed assessment of input costs, maintenance requirements, rehabilitation costs and
 +
 
 +
practice designs relevant to Canadian climates.[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/low-impact-development-life-cycle-costs/ The LID Life Cycle Costing Tool]
    
== Selection of Suite of LIDs  ==
 
== Selection of Suite of LIDs  ==
147

edits

Navigation menu