Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Check dams
(view source)
Revision as of 01:12, 19 September 2017
No change in size
,
7 years ago
no edit summary
Line 1:
Line 1:
−
{{
Plain
list|1=
+
{{
plain
list|1=
*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.
*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.
*Rocks used in check dams should have median diameter 25-75 mm.
*Rocks used in check dams should have median diameter 25-75 mm.
*The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.
*The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}}
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}}
Jenny Hill
8,255
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version