Changes

Jump to navigation Jump to search
Line 3: Line 3:  
==Strategies==
 
==Strategies==
 
===Disconnect impervious areas===  
 
===Disconnect impervious areas===  
Impervious areas have varying degrees of hydrologic impact depending on their connection to the receiving waterbody.  For example, impervious areas such as parking lots that drain directly to a concrete gutter and storm sewer will have a much greater impact than parking lots graded to drain to densely vegetated pervious areas.  Roof leaders or downspouts, parking lots, driveways, sidewalks, and patios should be disconnected from the storm sewer and directed towards stabilized pervious areas where possible (see [[downspout disconnection]] and [[vegetated filter strips]] for further design guidance).   
+
Impervious areas have varying degrees of hydrologic impact depending on their connection to the receiving waterbody.  For example, impervious areas such as parking lots that drain directly to a concrete gutter and storm sewer will have a much greater impact than parking lots graded to drain to densely vegetated pervious areas.   
 +
Roof leaders or downspouts, parking lots, driveways, sidewalks, and patios should be disconnected from the storm sewer and directed towards stabilized pervious areas where possible (see [[downspout disconnection]]).   
    
Opportunities for directing impervious surface runoff to pervious areas are first considered during the site layout stage. Sheet flow should be encouraged from all impervious surfaces draining to pervious areas. In cases of concentrated flow, the flow can be broken up with level spreaders or flow dissipating riprap. Use the following guidance for the pervious runoff receiving areas:
 
Opportunities for directing impervious surface runoff to pervious areas are first considered during the site layout stage. Sheet flow should be encouraged from all impervious surfaces draining to pervious areas. In cases of concentrated flow, the flow can be broken up with level spreaders or flow dissipating riprap. Use the following guidance for the pervious runoff receiving areas:
8,255

edits

Navigation menu