Changes

Jump to navigation Jump to search
no edit summary
Line 17: Line 17:  
*An [[underdrain]] to redistribute or remove excess water  
 
*An [[underdrain]] to redistribute or remove excess water  
 
*An [[Liner|impermeable membrane]] to prevent infiltration to soils below
 
*An [[Liner|impermeable membrane]] to prevent infiltration to soils below
   
==Planning considerations==
 
==Planning considerations==
 
<h3>Space</h3>  
 
<h3>Space</h3>  
Line 43: Line 42:  
<h3>Sizing</h3>
 
<h3>Sizing</h3>
 
{{:Bioretention: Sizing and modeling}}  
 
{{:Bioretention: Sizing and modeling}}  
<br>If additional storage volume is desired beneath an underdrain pipe, this may be sized as an [[Infiltration:_Sizing_and_modeling|infiltration trench]].  
+
If additional storage volume is desired beneath an underdrain pipe, this may be sized as an [[Infiltration:_Sizing_and_modeling|infiltration trench]].  
 
==Construction==
 
==Construction==
 
{{:Bioretention: Construction}}
 
{{:Bioretention: Construction}}
Line 49: Line 48:  
<h3>In Ontario</h3>
 
<h3>In Ontario</h3>
 
<strong>City of Mississauga</strong><br>
 
<strong>City of Mississauga</strong><br>
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program].  
+
The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies [https://www.mississauga.ca/portal/services/credit-program].  
 
<br>
 
<br>
 
<h3>LEED BD + C v. 4</h3>
 
<h3>LEED BD + C v. 4</h3>
8,255

edits

Navigation menu