Line 114: |
Line 114: |
| ---- | | ---- |
| | | |
− | ===Incentives and Credits===
| + | ==Incentives and Credits== |
− | <h4>In Ontario</h4> | + | <h3>In Ontario</h3> |
| <strong>City of Mississauga</strong><br> | | <strong>City of Mississauga</strong><br> |
| The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program]. | | The City of Mississauga has a stormwater management credit program which includes RWH as one of their recommended site strategies[https://www.mississauga.ca/portal/services/credit-program]. |
| <br> | | <br> |
− | <h4>LEED BD + C v. 4</h4> | + | <h3>LEED BD + C v. 4</h3> |
| <strong>Water Efficiency: Rainwater management (up to 3 points)</strong><br> | | <strong>Water Efficiency: Rainwater management (up to 3 points)</strong><br> |
− | <p>Note that for lines 1. and 2. preference is given to LID that 'best replicates natural site hydrology':
| + | Note that for lines 1. and 2. preference is given to LID that 'best replicates natural site hydrology': |
− | <ul>
| + | *Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events." |
− | <li>Two points (or 1 point for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 95th percentile of regional or local rainfall events." </li>
| + | *Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events." |
− | <li>Three points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 98th percentile of regional or local rainfall events." </li>
| |
− | </ul>
| |
| <strong>OR</strong> | | <strong>OR</strong> |
| For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events." | | For zero-lot-line projects only, 3 points (or 2 points for Healthcare) will be awarded if the project manages "the runoff from the developed site for the 85th percentile of regional or local rainfall events." |