− | Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets|ECB]]). | + | <p>Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]). |
− | *Mats should be applied with soil fill technique:
| + | Mats should be applied with soil fill technique: |
− | **Grade the swale and smooth the top soil, removing any debris and large rocks,
| + | <ol> |
− | **Seed with turf grass mixture,
| + | <li>Grade the swale and smooth the top soil, removing any debris and large rocks,</li> |
− | **Dig 150 mm anchor trench at the top of the channel,
| + | <li>Seed with turf grass mixture,</li> |
− | **Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,
| + | <li>Dig 150 mm anchor trench at the top of the channel,</li> |
− | **Unroll mat in the direction of flow. Staple as recommended by manufacturer,
| + | <li>Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,</li> |
− | **Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat,
| + | <li>Unroll mat in the direction of flow. Staple as recommended by manufacturer,</li> |
− | **Anchor the bottom end of the channel in a similar fashion to the top,
| + | <li>Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat, </li> |
− | **Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,
| + | <li>Anchor the bottom end of the channel in a similar fashion to the top, </li> |
− | **An [[Erosion control blankets|ECB]] may be applied to protect the surface through the first one or two years,
| + | <li>Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil, </li> |
− | **Irrigate until turf grass is established.
| + | <li>An [[Erosion control blankets| erosion control blanket]] may be applied to protect the surface through the first one or two years, </li> |
− | | + | <li>Irrigate until turf grass is established. </li> |
| + | </ol> |