*post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
 
*post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
   −
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: Daniel Filippi.
+
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: [[User: DanielFilippi|Daniel Filippi]].
    
==Stormwater as a valuable resource==
 