Line 67: Line 67:     
===Step 6: Conduct [[post-construction]] inspection and verification===
 
===Step 6: Conduct [[post-construction]] inspection and verification===
* [[Inspection and Maintenance|Inspect]] LID and stormwater systems to ensure they function as designed. Refer to [https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide] and [https://sustainabletechnologies.ca/app/uploads/2018/04/SWMFG2016_Guide_April-2018.pdf Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands]
+
* [[Inspection and maintenance|Inspect]] LID and stormwater systems to ensure they function as designed. Refer to [https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide] and [https://sustainabletechnologies.ca/app/uploads/2018/04/SWMFG2016_Guide_April-2018.pdf Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands]
 
* Complete "Post-Construction Verification" on relevant forms.
 
* Complete "Post-Construction Verification" on relevant forms.
 
* Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.
 
* Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.