Changes

Jump to navigation Jump to search
Line 22: Line 22:  
This report by TRCA discusses the recent 'Markham Municipal Green Road Pilot Project' that was established between 2015 - 2018 and which is located on Vanni Avenue, south east of the intersection of 14th Avenue and Middlefield Rd. in a a mixed use residential and commercial property area. The specially designed road includes multiple low impact development (LID) technologies, including [[Permeable pavement]] boulevards, [[Bioretention]] and [[Infiltration trenches]]/galleries underlain beneath the bioretention features to manage stormwater at the source. To learn more about this "Green Street" read the project brief by clicking the button above.
 
This report by TRCA discusses the recent 'Markham Municipal Green Road Pilot Project' that was established between 2015 - 2018 and which is located on Vanni Avenue, south east of the intersection of 14th Avenue and Middlefield Rd. in a a mixed use residential and commercial property area. The specially designed road includes multiple low impact development (LID) technologies, including [[Permeable pavement]] boulevards, [[Bioretention]] and [[Infiltration trenches]]/galleries underlain beneath the bioretention features to manage stormwater at the source. To learn more about this "Green Street" read the project brief by clicking the button above.
   −
{{Clickable button|[[File:Elm drive.PNG|130 px|link=https://cvc.ca/wp-content/uploads/2018/01/Elm-Drive-Low-Impact-Development-Monitoring-Case-Study_Mar-22.pdf]]}}
+
{{Clickable button|[[File:Elm drive.PNG|130 px|link=https://cvc.ca/document/elm-drive-performance-case-study-february-2018/?access=f13e914d454ac1412f72472e5fa2a59b]]}}
    
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[Underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reduction in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.
 
This report by CVC highlights the benefits of a multi-LID retrofit on a mixed-use street with residential homes and an education centre on Elm Drive in Mississauga. The retrofit included, a [[Permeable pavement]] sidewalk and parking layby along with six [[Bioretention]] cells connected with an [[Underdrain]]. The site now provides stormwater treatment by improving the quality of stormwater discharged (thermal mitigation, reduction in runoff volume to storm sewers, etc.) to Cooksville Creek. Read more by clicking the button above.

Navigation menu