Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
 
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
* Filter strip length of 5 metres.
+
* Filter strip length of 5 metres and width of 100 metres.
 
* Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1.
 
* Maximum acceptable impervious drainage area to pervious footprint area ratio of 4:1.
 
* Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet.
 
* Swale (0.3 m depth) and ditch inlet catch basin connected to storm sewer as outlet.