Changes

Jump to navigation Jump to search
Line 293: Line 293:     
==Life Cycle Costs==
 
==Life Cycle Costs==
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Enhanced Swales: Life Cycle Costs]] page to view accurate BMP cost estimates and learn to plan your own LID-based project budget with [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)].
+
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Enhanced Swales: Life Cycle Costs]] page to view a cost estimate.  Alternatively you can use the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)] to generate cost estimates customized to your own LID stormwater design project specifications.
    
Take a look at the [[Enhanced Swales: Life Cycle Costs]] page by clicking below for further details:
 
Take a look at the [[Enhanced Swales: Life Cycle Costs]] page by clicking below for further details:

Navigation menu