Changes

Jump to navigation Jump to search
Line 19: Line 19:     
===Notes===
 
===Notes===
*  
+
* Operation and maintenance cost estimates assume no rehabilitation of the green roof plantings nor waterproofing membrane is required to maintain acceptable drainage performance over the 50 year timeframe.
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.

Navigation menu