Changes

Jump to navigation Jump to search
Line 17: Line 17:  
===Notes===
 
===Notes===
 
* Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
 
* Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
 +
* Operation and maintenance cost estimates assume rehabilitation of the filter strip surface is required after 25 years of operation.
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.

Navigation menu