Changes

Jump to navigation Jump to search
Line 55: Line 55:  
Total life cycle cost estimate over the 50 year evaluation period for the below-ground concrete cistern design configuration is ($124,016.80), making it one of the cheapest LID BMP options.<br>
 
Total life cycle cost estimate over the 50 year evaluation period for the below-ground concrete cistern design configuration is ($124,016.80), making it one of the cheapest LID BMP options.<br>
   −
===Full Infiltration===
+
===No Infiltration===
 
[[File:RWH rain barrel.PNG|500px|thumb|A residential [[rain barrels|rain barrel]] collecting roofwater from the house installed with a diverter to ensure water does not overflow the system when full and allows water to instead bypass the barrel and enter directly into the storm sewer through a storm lateral or enter an on site [[dry swale]] or [[infiltration trench]], if installed.]]
 
[[File:RWH rain barrel.PNG|500px|thumb|A residential [[rain barrels|rain barrel]] collecting roofwater from the house installed with a diverter to ensure water does not overflow the system when full and allows water to instead bypass the barrel and enter directly into the storm sewer through a storm lateral or enter an on site [[dry swale]] or [[infiltration trench]], if installed.]]
    
[[File:Design Table RWH No Infil.PNG|700px]]<br>
 
[[File:Design Table RWH No Infil.PNG|700px]]<br>
 
</br>
 
</br>

Navigation menu