Changes

Jump to navigation Jump to search
Line 44: Line 44:  
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
 
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
   −
Material & Installation expenses represent the largest portion of total construction costs (50%).
+
Material & Installation expenses represent the largest portion of total construction costs (55%).
    
==Life Cycle Costs==
 
==Life Cycle Costs==

Navigation menu