Line 43: Line 43:  
#[[Infiltration trenches|Infiltration Trench: Partial Infiltration]]
 
#[[Infiltration trenches|Infiltration Trench: Partial Infiltration]]
   −
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (75 to 76%).
+
As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (76%).
    
==Life Cycle Costs==
 
==Life Cycle Costs==