Total life cycle cost estimates for the three porous asphalt configurations vary substantially with the No Infiltration design being highest ($253,195.66), compared to the Partial Infiltration design ($230,820.03), and followed closely by the Full Infiltration design ($221,669.04).
+
Total life cycle cost estimates for the three porous asphalt configurations vary substantially with the No Infiltration design being highest ($260,789.11), compared to the Partial Infiltration design ($237,742.21), and followed closely by the Full Infiltration design ($228,316.69).
    
It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>.
 
It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>.