| ==Design Assumptions== | | ==Design Assumptions== |
− | Infiltration chambers are an ideal technology for installing below any type of surface or landscape and for receiving and infiltrating large volumes of water. Components include: washed 25 or 50 mm diameter crushed angular stone to create a suitable storage reservoir, proprietary chambers, vaults, crates or perforated pipes that provide large water storage volume per unit area, [[geotextile]], [[underdrain|perforated pipe or underdrains]] and access structures. <br> | + | Infiltration chambers are an ideal technology for installing below any type of surface or landscape suitable for receiving and infiltrating large volumes of stormwater. Components typically include proprietary chamber system parts that provide large water storage volume per unit area, clear stone aggregate to construct base and embed chambers, [[Geotextile| geotextile]], [[Pretreatment| pretreatment devices]], and structures to access inlets and outlets, pretreatment devices and the chambers themselves for operation and maintenance. <br> |
| | | |
| Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: | | Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations: |
− | * Native soil infiltration rates for Full, Partial and No Infiltration Design scenarios were assumed to be 20 mm/h, 10 mm/h and 2 mm/h, respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate. | + | * Native soil infiltration rates for Full, and Partial Infiltration Design scenarios were assumed to be 20 mm/h and 10 mm/h respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate. |
| * Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from pretreatment structures annually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing (where applicable) | | * Operation and maintenance (O&M) cost estimates assume annual inspections, removal of trash and debris twice a year, removal of sediment from pretreatment structures annually, and removal of weeds twice a year (where applicable). Verification inspections are included every 5 years to confirm adequate maintenance, and every 15 years to confirm adequate drainage performance through in-situ surface infiltration rate testing (where applicable) |
| * Designed with an impervious drainage area to treatment facility area ratio of between 5:1 and 20:1. | | * Designed with an impervious drainage area to treatment facility area ratio of between 5:1 and 20:1. |