Changes

Jump to navigation Jump to search
Line 81: Line 81:  
<small>'''Note:''' Please click on each image to enlarge to view associated life cycle cost results.</small><br>
 
<small>'''Note:''' Please click on each image to enlarge to view associated life cycle cost results.</small><br>
   −
==Cost Summary Table ==
+
==Cost Summary Tables==
 
Total life cycle cost estimates for the three permeable pavement configurations vary substantially with the No Infiltration design being highest ($187,356.33), compared to the Partial Infiltration design ($168,085.10), and followed closely by the Full Infiltration design ($162,491.78).
 
Total life cycle cost estimates for the three permeable pavement configurations vary substantially with the No Infiltration design being highest ($187,356.33), compared to the Partial Infiltration design ($168,085.10), and followed closely by the Full Infiltration design ($162,491.78).
  

Navigation menu