Changes

Jump to navigation Jump to search
no edit summary
Line 111: Line 111:  
<h3>Water Quality</h3>
 
<h3>Water Quality</h3>
 
{{:Rainwater_harvesting:_Water_quality}}
 
{{:Rainwater_harvesting:_Water_quality}}
 +
 +
==Life Cycle Costs==
 +
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page to view accurate (within ±14% of actual construction costs<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>) BMP cost estimates and learn to plan your own LID-based project budget with [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)].
 +
 +
Take a look at the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page by clicking below for further details:
 +
 +
{{Clickable button|[[File:Construction Breakdown RWH No Infil.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/wiki/Rainwater_Harvesting_%26_Cisterns:_Life_Cycle_Costs]]}}
    
==Incentives and Credits==
 
==Incentives and Credits==

Navigation menu