Changes

Jump to navigation Jump to search
Line 152: Line 152:  
*'''Weather''': Porous asphalt and pervious concrete require a specific temperature range to set properly and the setting time can be several days<ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>.
 
*'''Weather''': Porous asphalt and pervious concrete require a specific temperature range to set properly and the setting time can be several days<ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>.
   −
Take a look at the [[Construction]] and [[Finishing grades and surface layer installation: permeable pavements]] page by clicking below for further details about proper inspection and maintenance practices:
+
Take a look at the [[Construction]] and [[Finishing grades and surface layer installation: permeable pavements]] page by clicking below for further details about proper construction.
 
<br/>
 
<br/>
  

Navigation menu