Changes

Jump to navigation Jump to search
no edit summary
Line 17: Line 17:  
#Remove the plastic once curing is complete.
 
#Remove the plastic once curing is complete.
   −
Note: Throughout the process of pouring concrete, the moisture content of the ready mix should be periodically adjusted to meet specification.
+
<small>'''Note:''' Throughout the process of pouring concrete, the moisture content of the ready mix should be periodically adjusted to meet specification.</small>
    
'''Key Inspection Points:'''
 
'''Key Inspection Points:'''

Navigation menu