Changes

Jump to navigation Jump to search
no edit summary
Line 3: Line 3:  
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]]. In general, this section describes construction and inspection processes for below ground installed materials and infrastructure that are part of the LID practices noted above.  
 
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]]. In general, this section describes construction and inspection processes for below ground installed materials and infrastructure that are part of the LID practices noted above.  
   −
In our effort to make this guide as functional as possible, we have decided to include proprietary systems and links to manufacturers websites. <br>
+
{{:Disclaimer}}
Inclusion of such links <strong>does not constitute endorsement</strong> by the Sustainable Technologies Evaluation Program. <br>
  −
Lists are ordered alphabetically; link updates are welcomed using the form below.
      
{{TOClimit|2}}
 
{{TOClimit|2}}

Navigation menu