Line 1: |
Line 1: |
| Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects: | | Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects: |
| <table table class = wikitable> | | <table table class = wikitable> |
− | <tr><th colspan =2>Erosion and Sediment Control<th>
| |
− | <tr><td></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control.</td></tr>
| |
− | <tr><td></td><td>Proper erosion and sediment controls should be in place for the drainage area.</td></tr>
| |
− | </table>
| |
− | Materials
| |
− | • Gravel for the underdrain should be clean and washed; no fines should be present in the material.
| |
− | • Underdrain pipe material should be perforated and of the correct size.
| |
− | • A cap should be placed on the upstream (but not the downstream) end of the underdrain.
| |
− | • Biomedia should be tested to confirm that it meets specifications.
| |
− | • Mulch composition should be correct.
| |
| | | |
− | Elevations
| + | <tr><th colspan =2>Erosion and Sediment Control</th></tr> |
− | Elevations of the following items should be checked for accuracy:
| + | <tr><td width = "5%"></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control</td></tr> |
− | • Depth of the gravel and invert of the underdrain
| + | <tr><td></td><td>Proper erosion and sediment controls should be in place for the drainage area</td></tr> |
− | • Inverts for inflow and outflow points
| + | <tr><th colspan =2>Materials</th></tr> |
− | • Filter depth after biomedia is placed
| + | <tr><td width = "5%"></td><td>Gravel for the underdrain should be clean and washed; no fines should be present in the material</td></tr> |
− | • Ponding depth provided between the surface of the filter bed and the overflow structure
| + | <tr><td></td><td>Underdrain pipe material should be perforated and of the correct size</td></tr> |
− | • Mulch depth
| + | <tr><td></td><td>A cap should be placed on the upstream (but not the downstream) end of the underdrain</td></tr> |
− | | + | <tr><td></td><td>Biomedia should be tested to confirm that it meets specifications</td></tr> |
− | Landscaping and Stabilization | + | <tr><td></td><td>Mulch composition should be correct</td></tr> |
− | • Correct vegetation should be planted.
| + | <tr><th colspan =2>Elevations</th></tr> |
− | • Pretreatment area should be stabilized.
| + | <tr><td width = "5%"></td><td>Depth of the gravel and invert of the underdrain</td></tr> |
− | • Drainage area should be stabilized prior to directing water to the bioretention.
| + | <tr><td></td><td>Inverts for inflow and outflow points</td></tr> |
− | | + | <tr><td></td><td><strong>Filter depth?</strong> after biomedia is placed</td></tr> |
− | The following items should be checked after the first rainfall event, and adjustments should be made as necessary: | + | <tr><td></td><td>Ponding depth provided between the surface of the filter bed and the overflow structure</td></tr> |
− | • Outfall protection/energy dissipation at concentrated inflow should be stable.
| + | <tr><td></td><td>Mulch depth</td></tr> |
− | • Flow should not concentrate and should spread evenly over the filter bed.
| + | <tr><th colspan =2>Landscaping and Stabilization</th></tr> |
− | • Ponded water at the surface of the bioretenton facility should drain within 24 hours of the end of the storm event. The filter media bed should fully drain within a maximum period of 72 hours.
| + | <tr><td width = "5%"></td>Correct vegetation should be planted</td></tr> |
− | • Excessive sediment accumulation should not be present.
| + | <tr><td></td><td>Pretreatment area should be stabilized</td></tr> |
| + | <tr><td></td><td>Drainage area should be stabilized prior to directing water to the bioretention</td></tr> |
| + | <tr><th colspan =2>The following items should be checked after the first rainfall event, and adjustments should be made as necessary:</th></tr> |
| + | <tr><td width = "5%"></td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr> |
| + | <tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr> |
| + | <tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. The filter media bed should fully drain within a maximum period of 72 hours</td></tr> |
| + | <tr><td></td><td>Excessive sediment accumulation should not be present</td></tr> |