Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
 
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
 
<table table class = wikitable>
 
<table table class = wikitable>
<tr><th colspan =2>Erosion and Sediment Control<th>
  −
<tr><td></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control.</td></tr>
  −
<tr><td></td><td>Proper erosion and sediment controls should be in place for the drainage area.</td></tr>
  −
</table>
  −
Materials
  −
• Gravel for the underdrain should be clean and washed; no fines should be present in the material.
  −
• Underdrain pipe material should be perforated and of the correct size.
  −
• A cap should be placed on the upstream (but not the downstream) end of the underdrain.
  −
• Biomedia should be tested to confirm that it meets specifications.
  −
• Mulch composition should be correct.
     −
Elevations
+
<tr><th colspan =2>Erosion and Sediment Control</th></tr>
Elevations of the following items should be checked for accuracy:
+
<tr><td width = "5%"></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control</td></tr>
Depth of the gravel and invert of the underdrain
+
<tr><td></td><td>Proper erosion and sediment controls should be in place for the drainage area</td></tr>
Inverts for inflow and outflow points
+
<tr><th colspan =2>Materials</th></tr>
Filter depth after biomedia is placed  
+
<tr><td width = "5%"></td><td>Gravel for the underdrain should be clean and washed; no fines should be present in the material</td></tr>
Ponding depth provided between the surface of the filter bed and the overflow structure  
+
<tr><td></td><td>Underdrain pipe material should be perforated and of the correct size</td></tr>
Mulch depth  
+
<tr><td></td><td>A cap should be placed on the upstream (but not the downstream) end of the underdrain</td></tr>
 
+
<tr><td></td><td>Biomedia should be tested to confirm that it meets specifications</td></tr>
Landscaping and Stabilization
+
<tr><td></td><td>Mulch composition should be correct</td></tr>
Correct vegetation should be planted.
+
<tr><th colspan =2>Elevations</th></tr>
Pretreatment area should be stabilized.
+
<tr><td width = "5%"></td><td>Depth of the gravel and invert of the underdrain</td></tr>
Drainage area should be stabilized prior to directing water to the bioretention.
+
<tr><td></td><td>Inverts for inflow and outflow points</td></tr>
 
+
<tr><td></td><td><strong>Filter depth?</strong> after biomedia is placed</td></tr>
The following items should be checked after the first rainfall event, and adjustments should be made as necessary:
+
<tr><td></td><td>Ponding depth provided between the surface of the filter bed and the overflow structure</td></tr>
Outfall protection/energy dissipation at concentrated inflow should be stable.
+
<tr><td></td><td>Mulch depth</td></tr>
Flow should not concentrate and should spread evenly over the filter bed.
+
<tr><th colspan =2>Landscaping and Stabilization</th></tr>
Ponded water at the surface of the bioretenton facility should drain within 24 hours of the end of the storm event.  The filter media bed should fully drain within a maximum period of 72 hours.
+
<tr><td width = "5%"></td>Correct vegetation should be planted</td></tr>
Excessive sediment accumulation should not be present.
+
<tr><td></td><td>Pretreatment area should be stabilized</td></tr>
 +
<tr><td></td><td>Drainage area should be stabilized prior to directing water to the bioretention</td></tr>
 +
<tr><th colspan =2>The following items should be checked after the first rainfall event, and adjustments should be made as necessary:</th></tr>
 +
<tr><td width = "5%"></td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
 +
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
 +
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event.  The filter media bed should fully drain within a maximum period of 72 hours</td></tr>
 +
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>