Changes

Jump to navigation Jump to search
no edit summary
Line 6: Line 6:  
Elm Drive Bioretention.JPG|[[Bioretention]] cells on Elm Drive, Mississauga, are lower then the adjacent road to accommodate a catch basin [[inlet]] between the paved surface and the cells.
 
Elm Drive Bioretention.JPG|[[Bioretention]] cells on Elm Drive, Mississauga, are lower then the adjacent road to accommodate a catch basin [[inlet]] between the paved surface and the cells.
 
Lakeside - sheet flow parking lot 1.JPG| The grade and lack of curb allow for sheet-flow runoff into this bioretention facility. Lakeside Park, Mississauga, ON
 
Lakeside - sheet flow parking lot 1.JPG| The grade and lack of curb allow for sheet-flow runoff into this bioretention facility. Lakeside Park, Mississauga, ON
 +
File:Ultra urban bioret bump out 2.jpg|300px|Bioretention bump out feature in a dense urban setting. Includes [[Curb cuts]] on the walkway side of the installation, with [[overflow]] and [[Level spreaders]] at the far end of the bioretention cell and [[Pretreatment|catch basin]] in the foreground.
 +
 +
 
</gallery>
 
</gallery>
    
[[Category:Gallery]]
 
[[Category:Gallery]]

Navigation menu