Changes

Jump to navigation Jump to search
no edit summary
Line 30: Line 30:  
*Where drainage or conveyance to a downstream facility is a greater priority, the base of the reservoir and the underdrain pipe may have a gradient of up to 1-2%.
 
*Where drainage or conveyance to a downstream facility is a greater priority, the base of the reservoir and the underdrain pipe may have a gradient of up to 1-2%.
   −
==Maintenance and inspection==
+
==Inspection and maintenance==
 
[[File:45 degs.PNG|thumb|Schematic of pipes and connectors]]
 
[[File:45 degs.PNG|thumb|Schematic of pipes and connectors]]
 
[[File:Jet cleaning.jpg|thumb|Diagram of hydrojetting cleaning apparatus]]
 
[[File:Jet cleaning.jpg|thumb|Diagram of hydrojetting cleaning apparatus]]

Navigation menu