[[Bioretention]] and [[Permeable pavement]] practices within the municipal road right of way (ROW). Permeable pavement was incorporated at the end of resident’s driveways and bioretention units were situated along frontages in the boulevard. To read more about the Lakeview project being a fully functional LID demonstration showcase site that can be used as a model for future ROW retrofit projects, click the button above. | [[Bioretention]] and [[Permeable pavement]] practices within the municipal road right of way (ROW). Permeable pavement was incorporated at the end of resident’s driveways and bioretention units were situated along frontages in the boulevard. To read more about the Lakeview project being a fully functional LID demonstration showcase site that can be used as a model for future ROW retrofit projects, click the button above. |