Changes

Jump to navigation Jump to search
no edit summary
Line 95: Line 95:     
Read more about [[Stormwater Tree Trenches]] here.
 
Read more about [[Stormwater Tree Trenches]] here.
 +
 +
==Permeable Pavement==
 +
    
==Wetlands==
 
==Wetlands==
Line 152: Line 155:  
CVC, back in 2014 developed a document aimed at contractors, whose clients (municipalities) are facing many stormwater challenges, including aging and deficient infrastructure, frequent extreme weather, flash flooding, and degrading water quality. Municipalities are relying on stormwater management ponds for flood control and water quality treatment, but they are consistently looking at Low Impact Development (LID) as a way to shore up their stormwater management strategy. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] are a great way for contractors to understand what Municipalities are looking for who want to implement well designed and well-performing LID installations. Click the button above to learn more.
 
CVC, back in 2014 developed a document aimed at contractors, whose clients (municipalities) are facing many stormwater challenges, including aging and deficient infrastructure, frequent extreme weather, flash flooding, and degrading water quality. Municipalities are relying on stormwater management ponds for flood control and water quality treatment, but they are consistently looking at Low Impact Development (LID) as a way to shore up their stormwater management strategy. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] are a great way for contractors to understand what Municipalities are looking for who want to implement well designed and well-performing LID installations. Click the button above to learn more.
   −
{{Clickable button|[[File:Lessons learned contractors.PNG|120 px|link=https://cvc.ca/wp-content/uploads/2014/01/Construction-Case-Study-v6-Designer-Consulting-EngineerFINAL.pdf]]}}
+
{{Clickable button|[[File:Lessons learned for design eng etc.PNG|120 px|link=https://cvc.ca/wp-content/uploads/2014/01/Construction-Case-Study-v6-Designer-Consulting-EngineerFINAL.pdf]]}}
    
CVC, back in 2014 developed another document aimed at designers, consulting engineers, municipalities, landowners and inspectors. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] will allow you to be able to:
 
CVC, back in 2014 developed another document aimed at designers, consulting engineers, municipalities, landowners and inspectors. This document and CVC’s, [https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf LID Construction Guide] will allow you to be able to:

Navigation menu