Changes

Jump to navigation Jump to search
no edit summary
Line 148: Line 148:  
* Solid pipe from inlet structures should transition to perforated pipe once 300 mm inside the trench.   
 
* Solid pipe from inlet structures should transition to perforated pipe once 300 mm inside the trench.   
 
* Perforated pipe should be minimum 150 mm dia. rigid, smooth interior wall HDPE or PVC with perforations on sides, wrapped with geotextile sock, with capacity and perforation specifications confirmed by the designing Engineer based on hydraulic requirements.
 
* Perforated pipe should be minimum 150 mm dia. rigid, smooth interior wall HDPE or PVC with perforations on sides, wrapped with geotextile sock, with capacity and perforation specifications confirmed by the designing Engineer based on hydraulic requirements.
 +
 +
==Benefits of Trees==
 +
Stormwater Tree Trenches help support healthy street trees in urban settings where conventional plantings have limited space for root establishment. Trees play a critical role in stormwater management from reducing runoff through canopy interception, evapotranspiration, filtering out pollutants, and increasing infiltration capacity of soils, to retaining runoff. Trees also provide a myriad other environmental benefits, from shading impervious surfaces and thereby reducing urban heat island effects, to providing wildlife habitat and improving the aesthetics of streets and neighbourhoods. Research has shown that healthy trees increase property values, retail spending and contribute to a sense of community pride and safety.
 +
 +
At right is a list of trees that are known to tolerate conditions in northern (Zone 3) urban stormwater tree trenches.
 +
    
==Soil cells==
 
==Soil cells==

Navigation menu