Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Permeable pavements: Gallery
(view source)
Revision as of 18:30, 13 August 2020
59 bytes removed
,
4 years ago
no edit summary
Line 12:
Line 12:
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
−
Gridpaver.png.jpg|Permeable grid system filled with gravel
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)
Sahlla Abbasi
339
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version