Changes

Jump to navigation Jump to search
Line 58: Line 58:     
===Underdrain===
 
===Underdrain===
The diagram below displays permeable pavement cross sections showing full and partial infiltration designs<ref>Greater Vancouver Regional District (GVRD). 2005. Stormwater Source Control Design Guidelines 2005. Prepared by Lanarc Consultants Limited, Kerr Wood Leidal Associates Limited and Goya Ngan. </ref>.
+
The diagram below displays permeable pavement cross sections showing full and partial infiltration designs.<ref>Greater Vancouver Regional District (GVRD). 2005. Stormwater Source Control Design Guidelines 2005. Prepared by Lanarc Consultants Limited, Kerr Wood Leidal Associates Limited and Goya Ngan. </ref>  
 
[[File:PermeablePaving CrossSection.png|border|Permeable Pavement cross sections showing full and partial infiltration designs. Source: GVRD, 2005]]
 
[[File:PermeablePaving CrossSection.png|border|Permeable Pavement cross sections showing full and partial infiltration designs. Source: GVRD, 2005]]
  
339

edits

Navigation menu