Changes

Jump to navigation Jump to search
Line 80: Line 80:  
It is best applied to calculate the maximum duration of ponding on the surface of [[bioretention cells]], and upstream of check dams of [[bioswales]] and [[enhanced grass swales]] to ensure all surface ponding drains within 48 hours.  
 
It is best applied to calculate the maximum duration of ponding on the surface of [[bioretention cells]], and upstream of check dams of [[bioswales]] and [[enhanced grass swales]] to ensure all surface ponding drains within 48 hours.  
 
To calculate the time (''t'') to fully drain surface ponded water through the filter media or planting soil:  
 
To calculate the time (''t'') to fully drain surface ponded water through the filter media or planting soil:  
<math>t=\frac{d<sub>p</sub>}{K<sub>f</sub>}</math>
+
<math>t=\frac{dp}{Kf}</math>
Where d<sub>p</sub>' is the mean or effective surface ponding depth.
+
Where  
 +
d<sub>p</sub>' is the mean or effective surface ponding depth.
 +
K<sub>f</sub> is the minimum saturated hydraulic conductivity of the filter media or planting soil.
    
==Drainage time to empty facility==
 
==Drainage time to empty facility==

Navigation menu