Changes

Jump to navigation Jump to search
Line 82: Line 82:  
<math>d_{p}'=d_{p, max}\times 1/2</math><br>
 
<math>d_{p}'=d_{p, max}\times 1/2</math><br>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
*d<sub>p, max</sub> = maximum surface ponding depth}} (m)<br>
+
*d<sub>p, max</sub> = maximum surface ponding depth (m)}}<br>
 
For practices with hard edges and vertical-walled ponding areas (e.g., stormwater planter, soil cell) use the maximum ponding depth,
 
For practices with hard edges and vertical-walled ponding areas (e.g., stormwater planter, soil cell) use the maximum ponding depth,
 
<math>d_{p}'=d_{p, max}</math>
 
<math>d_{p}'=d_{p, max}</math>

Navigation menu