Changes

Jump to navigation Jump to search
Line 102: Line 102:  
*''f''' is the design infiltration rate (mm/hr),  
 
*''f''' is the design infiltration rate (mm/hr),  
 
*''P'' is the perimeter of the practice (m), and
 
*''P'' is the perimeter of the practice (m), and
*''d<sub>T</sub>'' is the total depth of the practice, including the maximum surface ponding depth (m).}}
+
*''d<sub>T</sub>'' is the total depth of the practice, including the surface ponding depth (m).}}
    
===Groundwater mounding===
 
===Groundwater mounding===

Navigation menu