Changes

Jump to navigation Jump to search
Line 56: Line 56:  
*''f''' = Design infiltration rate (mm/hr),
 
*''f''' = Design infiltration rate (mm/hr),
 
*''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements; and
 
*''t'' = [[Drainage time]] (hrs). Check local regulations for drainage time requirements; and
*''n'' = [[Porosity]] of the reservoir aggregate}}
+
*''n'' = Porosity of the reservoir aggregate}}
    
===Additional step for system without underdrain===
 
===Additional step for system without underdrain===

Navigation menu