Changes

Jump to navigation Jump to search
153 bytes removed ,  5 years ago
m
Line 19: Line 19:  
The objective of these design recommendations are to maximize the distribution of ponded water along the whole BMP. Detailed design may require iteration of the dam heights and distances along each section of a long swale.
 
The objective of these design recommendations are to maximize the distribution of ponded water along the whole BMP. Detailed design may require iteration of the dam heights and distances along each section of a long swale.
 
----
 
----
<div style="float: right">{{#widget:WolframAlpha|id=a04d99bf6eaf9309e13e0b359f7368e2}}{{#widget:WolframAlpha|id=edc4fd3f7f54774d9ab0471f34d6041c}}</div>
   
To estimate the depth of water that can be infiltrated into a surface within a given time:  
 
To estimate the depth of water that can be infiltrated into a surface within a given time:  
  
8,255

edits

Navigation menu