Feedback post on Bioretention
Jump to navigation
Jump to search
99.244.186.59 did not find what they were looking for.
5 years agoIn the second line 'n' should be changed to 'in'
Overview section - 1st line, add a hyphen between 'well' and 'recognized'
Additional Components section - Add Impervious liner to the list of components with the explanation that an impervious liner can be used where the bioretention installation is proposed in close proximity to buildings, in areas where the water table is high and over contaminated soils
Space section - 3rd bullet, second line - add hyphen between 'trade' and 'off'
4th bullet should be changed to read '...from having very curvilinear, soft edges and variable depth...'. Add a hyphen between 'hard' and 'sided'
6th bullet - add 'with' before 'regards'. Change text to read, '...check to ensure that the future canopy height...'
Overflow routing section - sidebar sketches should include labels 'Off-line' and 'On-line' in order to correspond with the text in the 'Routing' section
Overflow Elevation section - 2nd line - 'timeltime' should be changed to 'timeline'
Freeboard section - 3rd bullet - 'above grade' is repeated. Delete second 'above grade' and add hyphen between 'above' and 'grade' in the remaining reference.
Gallery - 2nd image from the left. Correct the location of the photo credit and change capital 'B' in subsequent word to lower-case.
Plant Selection section - Add text that discourages the use of non-native, invasive species and promotes use of native species that are indigenous to the region
Is this feedback helpful?YesNo
99.244.186.59 did not find what they were looking for.
5 years ago