File:Screenshot 2025-09-22 120027.png

From LID SWM Planning and Design Guide
Jump to navigation Jump to search

Original file(1,114 × 718 pixels, file size: 592 KB, MIME type: image/png)

Flood, water quality and water balance control in a hybrid trench and bioretention system. Water quality and water balance storage are provided through infiltration below the underdrain. Active storage above the underdrain provides channel and flood protection. The underdrain may be fitted with an orifice to meet release rate requirements. The infiltration rate increases with hydraulic head, resulting in potentially higher rates of volume reduction through infiltration than conventional LID not designed for flood control. Inlets consisted of a distributed network of curb cuts draining to high flow through cobble/gravel columns (roughly 1 x 2 m). Source of base image: Schollen and Co.)

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:01, 22 September 2025Thumbnail for version as of 16:01, 22 September 20251,114 × 718 (592 KB)ChristineLN (talk | contribs)

There are no pages that use this file.

Metadata