Vertical separation

From LID SWM Planning and Design Guide
Revision as of 01:05, 24 October 2018 by Jenny Hill (talk | contribs)
Jump to navigation Jump to search

[1]

[2]


[3]


[4]


[5]


[6] in turn citing [7]


  1. Province of Ontario. “O. Reg. 332/12: BUILDING CODE,” 2018. https://www.ontario.ca/laws/regulation/120332.
  2. Karathanasis, A D, T G Mueller, B Boone, and Y L Thompson. “Nutrient Removal from Septic Effluents as Affected by Soil Thickness and Texture.” Journal of Water and Health 4, no. 2 (June 2006): 177–95. http://www.ncbi.nlm.nih.gov/pubmed/16813011.
  3. Stall, Christopher, Aziz Amoozegar, David Lindbo, Alexandria Graves, and Diana Rashash. “Transport of E. Coli in a Sandy Soil as Impacted by Depth to Water Table.” Journal of Environmental Health 76, no. 6: 92–100. Accessed October 23, 2018. http://www.ncbi.nlm.nih.gov/pubmed/24645419.
  4. RI Department of Environmental Management. “Section 5.5.1 and 5.5.4 RISDISM Guidance -- Filtering Systems: Separation to Seasonal High Groundwater Table,” 2016.
  5. Ontario. “F-6-1 Procedures to Govern Separation of Sewers and Watermains | Ontario.Ca,” 2016. https://www.ontario.ca/page/f-6-1-procedures-govern-separation-sewers-and-watermains.
  6. Rathfelder, K., and M. Wei. “Underground Stormwater Infiltration: Best Practice for Protection of Groundwater Resources in British Columbia,” 2014.
  7. Washington St.ate Department of Ecology. “Guidance for UIC Wells That Manage Stormwater,” 2006.