From LID SWM Planning and Design Guide
Jump to navigation
Jump to search
Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.
Phase construction so that LID measures are constructed last. Underground LID features can be built early in the construction process, provided they are protected by a barrier such as a plug.
Keep LID installations offline via flow diversion until construction is complete, the drainage area is stabilized, and vehicle mud tracking is stopped.
Be mindful of stockpile locations relative to LID areas.
Inspect LID areas during ESC site inspections