Difference between revisions of "Wells"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
Line 1: Line 1:
 
+
Monitoring wells are frequently installed on infiltrating systems such as [[bioretention]], [[bioswales]], [[infiltration trenches]] and hybrids thereof.
 
+
The two questions most frequently addressed are:
 
+
{{Textbox|1=
 +
#How quickly is surface ponding being infiltrated beneath the surface?
 +
#How quickly is the facility draining through exfiltration to native soils and/or through an [[underdrain]]?
 +
}}
 
*Where possible, wells for measuring water levels within [[permeable pavement]] systems should be outside of trafficked areas.
 
*Where possible, wells for measuring water levels within [[permeable pavement]] systems should be outside of trafficked areas.

Revision as of 15:35, 29 October 2018

Monitoring wells are frequently installed on infiltrating systems such as bioretention, bioswales, infiltration trenches and hybrids thereof. The two questions most frequently addressed are:

  1. How quickly is surface ponding being infiltrated beneath the surface?
  2. How quickly is the facility draining through exfiltration to native soils and/or through an underdrain?
  • Where possible, wells for measuring water levels within permeable pavement systems should be outside of trafficked areas.