Difference between revisions of "Grading"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) m |
Jenny Hill (talk | contribs) m |
||
Line 1: | Line 1: | ||
==Slope Gradient== | ==Slope Gradient== | ||
Slope gradients are expressed as Y:X where Y is a single unit of rise and X is the corresponding run. It can be calculated by dividing the rise by the run: | Slope gradients are expressed as Y:X where Y is a single unit of rise and X is the corresponding run. It can be calculated by dividing the rise by the run: | ||
− | e.g.:<math>\frac{rise}{run}=\frac{4\ m}{12\ m}=\frac{1}{3};\ | + | e.g.:<math>\frac{rise}{run}=\frac{4\ m}{12\ m}=\frac{1}{3};\we\ say\ the\ slope\=1:3\ or\ 1\ in\ 3</math> |
==Slope percentage== | ==Slope percentage== |
Revision as of 01:55, 19 October 2018
Slope Gradient
Slope gradients are expressed as Y:X where Y is a single unit of rise and X is the corresponding run. It can be calculated by dividing the rise by the run: e.g.:Failed to parse (unknown function "\we"): {\displaystyle \frac{rise}{run}=\frac{4\ m}{12\ m}=\frac{1}{3};\we\ say\ the\ slope\=1:3\ or\ 1\ in\ 3}
Slope percentage
Slope percentage
Use | Extreme range (%) | Desirable range (%) |
---|---|---|
Public Streets | 0.5 - 10 | 1 - 8 |
Private streets | 0.5 - 20 | 1 - 12 |
Service lanes | 0.5 - 15 | 1 - 10 |
Parking areas | 0.5 - 8 | 1 - 5 |
Parking ramps | up to 20 | up to 15 |
Collector walks | 0.5 - 12 | 1 - 8 |
Entrance walks | 0.5 - 8 | 1 - 4 |
Pedestrian ramps | up to 12 | up to 8 |
Stairs | 25 - 50 | 33 - 50 |
Game courts | 0.5 - 2 | 0.5 - 1.5 |
Paved gutters | 0.25 - 100 | 1 - 50 |
Grassed swales | 0.5 - 15 | 2 - 10 |
Terraces and sitting areas | 0.5 - 3 | 1 - 2 |
Grassed banks | up to 50 | up to 33 |
Planted banks | up to 100 | up to 50 |
- ↑ Ontario. O. Reg. 191/11: INTEGRATED ACCESSIBILITY STANDARDS, 2011. https://www.ontario.ca/laws/regulation/r11191.
- ↑ Strom, S., Nathan, K., Woland, J. Site Engineering for Landscape Architects (6th Ed.) 2013, Wiley and Sons