Difference between revisions of "Drawings"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
Line 4: Line 4:
 
If you want help in finding example details for an LID design, please email STEP or use the comment box below.   
 
If you want help in finding example details for an LID design, please email STEP or use the comment box below.   
 
{{textbox| 1=
 
{{textbox| 1=
You know that typical drawings are no substitute for engineered design!}}  
+
You know that typical drawings are no substitute for properly configured design!}}  
  
 
==Ontario Municipal==
 
==Ontario Municipal==

Revision as of 14:17, 17 October 2018

You do not have permission to embed PDF files. Whilst we consider preparing our own set of STEP LID drawings, we are providing a quick reference list to DWG files from others (including proprietary systems).

If you want help in finding example details for an LID design, please email STEP or use the comment box below.

You know that typical drawings are no substitute for properly configured design!

Ontario Municipal[edit]

  • The City of Toronto Green Streets program included production of many drawn'typicals'. See example of curb extensions to the right.
  • The City of Kitchener has standard details for... which Matt Wilson is going to send me a link to.
  • The City of Barrie has a draft standard detail for an exfiltration trench on page 125 of the linked document. Note that the within-WHPA detail is not supported by STEP.

Elsewhere[edit]

Proprietary[edit]

In our effort to make this guide as functional as possible, we have decided to include proprietary systems and links to manufacturers websites.
Inclusion of such links does not constitute endorsement by the Sustainable Technologies Evaluation Program.
Lists are ordered alphabetically; link updates are welcomed using the form below.