Difference between revisions of "Permeable pavements: Sizing"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
Line 18: Line 18:
 
<math>d_{s, max}=\frac{f'\times t}{0.4}</math>
 
<math>d_{s, max}=\frac{f'\times t}{0.4}</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
*''f''' = Design infiltration rate (mm/hr), and
+
*''f''' = [[Design infiltration rate]] (mm/hr), and
 
*''t'' = [[Drainage time]] (hrs), e.g. 96 hours, check local regulations for drainage time requirements.   
 
*''t'' = [[Drainage time]] (hrs), e.g. 96 hours, check local regulations for drainage time requirements.   
*''0.4'' = Void ratio of [[reservoir gravel|clear stone]]}}
+
*''0.4'' = Void ratio of [[Reservoir aggregate|clear stone]]}}
  
 
----
 
----

Revision as of 18:04, 26 September 2018

The following calculation is used to size the stone storage bed (reservoir) used as a base course. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are taken from the ICPI Manual [1]

To calculate the total depth of the stone reservoir (all graded layers)[edit]

The equation for the depth of the stone bed is as follows:

Where:

  • d = Stone bed depth (m)
  • Qc = Depth of runoff from contributing drainage area, not including permeable paving surface (m)
  • R = Ac/Ap; the ratio of contributing drainage area (Ac) to permeable paving area (Ap). Note that the contributing drainage area (Ac) should not contain pervious areas.
  • P = Rainfall depth (m)
  • f' = Design infiltration rate (m/day)
  • t = Time to fill stone bed (typically 2 hr)
  • VR = Void ratio for stone bed (typically 0.4 for 50 mm dia. clear stone)

To calculate the invert of the underdrain from the base of the reservoir[edit]

For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe (ds, max) can be calculated as follows:

Where:


(f') used in the above equations should be the design infiltration rate that incorporates a safety correction factor. On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.


When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used: Failed to parse (syntax error): {\displaystyle A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}}

  1. Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design, Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute. Burlington, ON.