Then calculate the required depth (d<sub>T</sub>), as:
 
Then calculate the required depth (d<sub>T</sub>), as:
<math>d=\frac{D \left[ (R\times i)-f'\right]}{V_{R}}</math>
+
<math>d_{T}=\frac{D \left[ (R\times i)-f'\right]}{V_{R}}</math>
  
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''D'' = Duration of design storm in hrs
 
*''D'' = Duration of design storm in hrs
 
*''i'' = Intensity of design storm in mm/hr
 
*''i'' = Intensity of design storm in mm/hr
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
+
*''f''' = Design infiltration rate in mm/hr  
*''SCF'' = Safety correction factor
+
*''V<sub>R</sub>'' = Void ratio  
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)
+
*''d<sub>T</sub>'' = Depth of infiltration practice in m.}}
*''R'' = Ratio of catchment area (''A<sub>c</sub>'') to BMP footprint area (A<sub>p</sub>) syn. I/P ratio. 
 
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
 
*''A<sub>c</sub>'' = Catchment area in m<sup>2</sup>
 
*''d'' = Depth of infiltration practice in m.}}
 
 
The following equations assume that infiltration occurs primarily through the base of the facility.  
 
The following equations assume that infiltration occurs primarily through the base of the facility.  
 
They may be easily applied for any shape and size of infiltration facility, in which the reservoir storage is mostly in an aggregate.   
 
They may be easily applied for any shape and size of infiltration facility, in which the reservoir storage is mostly in an aggregate.   

Revision as of 20:27, 2 April 2018

Before beginning the sizing calculations most of the following parameters must be known or estimated. The exceptions are the depth (d) and Permeable area (P), as only one of these is required to find the other. Note that some of these parameters are limited:

  1. The maximum total depth will be limited by construction practices i.e. not usually > 2 m.
  2. The maximum total depth may be limited by the conditions underground e.g. the groundwater or underlying geology/infrastructure.
  3. The minimum total depth will be limited by the need to support vegetation i.e. not < 0.6 m.
  4. Bioretention has a maximum recommended I/P ratio of 20.

Size a bioretention cell for constrained depth[edit]

Depth to GW If there is a constraint to the depth (dT, m) of the infiltration practice, calculate the required footprint area (Ap, m2), as:

Where:

  • Ap = Area of the infiltration practice in m2
  • Ac = Catchment area in m2
  • D = Duration of design storm in hrs
  • i = Intensity of design storm in mm/hr
  • f' = design infiltration rate in mm/hr
  • VR = Mean void ratio of the fill within the practice
  • dT = Total depth of the infiltration practice in m.

Size a bioretention cell for constrained ground area[edit]

Error in widget WolframAlpha: Unable to load template 'wiki:WolframAlpha'

If the land area is limited, determine the ratio of catchment (Ac) to BMP footprint area (Ap):

Where:

  • R = Ratio of catchment area (Ac) to BMP footprint area (Ap) syn. I/P ratio.
  • Ap = Area of the infiltration practice in m2
  • Ac = Catchment area in m2

Then calculate the required depth (dT), as:

Where:

  • D = Duration of design storm in hrs
  • i = Intensity of design storm in mm/hr
  • f' = Design infiltration rate in mm/hr
  • VR = Void ratio
  • dT = Depth of infiltration practice in m.

The following equations assume that infiltration occurs primarily through the base of the facility. They may be easily applied for any shape and size of infiltration facility, in which the reservoir storage is mostly in an aggregate.

This spreadsheet tool has been set up to perform either of the above calculations.
Download .xlsx calculation tool

Calculate drawdown time[edit]

Two footprint areas of 9 m2.
Perimeter = 12 m (left) Perimeter = 20 m (right)

In some situations, it may be possible to reduce the size of the bioretention required, by accounting for rapid drainage. Typically, this is only worth exploring over sandy soils with rapid infiltration. Note that narrow, linear bioretention features drain faster than round or blocky footprint geometries.

  • Begin the drainage time calculation by dividing the area of the practice (Ap) by the perimeter (P).
  • To estimate the time (t) to fully drain the facility:

Where:

  • VR is the void ratio of the media,
  • Ap is the area of the practice (m2),
  • f' is the design infiltration rate (mm/hr),
  • P is the perimeter of the practice (m), and
  • dT is the total depth of the practice, including the ponding zone (m).

This 3 dimensional equation makes use of the hydraulic radius (Ap/P), where P is the perimeter (m) of the facility.